RACK & STACK · ROTTERDAM
From pallet to powered-on: build-outs in Rotterdam datacenters, designed, cabled, validated and documented to the cable.
HOW WE BUILD
Every build-out in Rotterdam runs through the same five phases as everywhere else we work: that is the point. Whether it is a single rack or a full row, the standard does not change.
PHASE 1
We plan the rack layout, power budget and cable paths before anything ships.
PHASE 2
Servers, switches and PDUs racked exactly to the plan.
PHASE 3
Structured cabling, dressed and labeled on both ends.
PHASE 4
Every port, power feed and link tested before handover.
PHASE 5
Complete documentation, down to the cable.
WHERE WE BUILD
Also need day-to-day support after the build? Remote hands in Rotterdam
ONE PARTNER, EVERY LOCATION
1 contact
One point of contact for every ticket in Rotterdam and everywhere else your racks live.
1 invoice
One monthly invoice covering all locations, instead of a stack of local vendors billing separately.
1 way of working
The same ticket flow, documentation standard and photo proof at every facility, in every country.
Racking and cabling new hardware from pallet to powered-on: rails, mounting, structured cabling, labeling, power distribution and a documented handover, following your rack layout or one we draw up together.
Any of them. Our engineers work in every datacenter in Rotterdam; our list shows 4 of them, including Bytesnet, Smartdc and TCNPP sites. Is yours not on it? Tell us where the build is and we take it from there.
We stay at the physical layer and the console: racking, cabling, power and link validation. For switch and OS configuration we set up console sessions so your engineers do the logical work through our connection, live on site. Your configs stay yours.
Tell us what you're running. We'll tell you how we'd handle it.